It's 7:00 AM in Miami and we're answering calls. Call (555) 000-0000 for 24/7 emergency seawall service.

Residential & Commercial Docks

Dock Repair and Construction in Miami.

If you need dock repair or construction in Miami, our licensed marine crew builds and restores residential and commercial docks alongside seawall work. Concrete, composite, and pressure-treated lumber.

  • Concrete, composite, pressure-treated
  • Piling and deck construction
  • Permits handled (DERM, USACE)
  • 10-year workmanship warranty
Get My Free InspectionCall (555) 000-0000
Dock Quote 2-hour response in business hours

No spam. We respond within 2 hours during business hours.

What dock repair and construction in Miami covers.

Dock work falls into two main categories: repair and new construction. Both share the same constraints in Miami: saltwater, FBC HVHZ wind code, USACE jurisdiction over navigable waters, and DERM environmental review.

Piling installation

Pre-stressed concrete, composite, or pressure-treated wood pilings driven from a barge to engineered depth. Concrete is preferred for Miami long-term service life and is required for many commercial applications.

Deck framing and decking

Galvanized or stainless framing connectors, composite or pressure-treated stringers, composite or hardwood decking. Composite decking is increasingly the residential default for maintenance reasons.

Repair scope

Localized piling replacement, framing repair, deck board replacement, structural reinforcement after vessel impact or hurricane damage.

Permits

New docks and substantial repairs typically require DERM environmental review and USACE permit for navigable waters. We handle the submittals.

Signs your Miami dock needs attention.

  • Soft spots in the deck.
  • Piling rot at the waterline (timber).
  • Cracking on concrete pilings near the waterline.
  • Loose connectors or visible corrosion at framing connections.
  • Post-storm deflection or shifted alignment.
  • Age past 25 to 30 years on timber-piling docks.

Why Miami Owners Choose Us

Three reasons.

01

Marine Hardware Throughout

Connectors, bolts, and brackets are stainless or hot-dip galvanized per ASTM A123. Saving cost on hardware is the most common reason Miami docks fail early.

ASTM A123 minimum throughout
02

Engineered To Miami Wind Code

Dock framing and connections engineered to FBC HVHZ wind loading. Most pre-2010 docks in Miami were not.

FBC HVHZ wind code engineered
03

Combined With Seawall Work

When we are doing seawall repair or replacement, dock work can be added to the mobilization for substantial savings on barge and crew costs.

~30% savings when bundled with seawall job

Pricing factors.

  • Dock length and width.
  • Piling type: wood, concrete, composite.
  • Decking choice: pressure-treated, composite, hardwood.
  • Roof structure or covered slip.
  • Permitting for new docks and major repairs.

Typical Miami residential dock construction runs 100 to 250 dollars per square foot of deck.

Local context.

Miami-Dade DERM and USACE both regulate dock construction in navigable waters and environmentally sensitive areas. Mangrove proximity, manatee zone restrictions, and seagrass surveys can all factor into permitting. Construction methods, decking spacing, and lighting are all addressed in current permits to protect marine habitat.

What Miami waterfront owners say.

★★★★★
"Wall had visible movement and an obvious tieback failure. They installed four helical anchors with controlled pull-back and brought the cap within three quarters of an inch of plumb. 25-year warranty on the anchors. Could not tell anything had been done from the lawn side."
Thomas G.Key Biscayne · Tieback and anchor repair
★★★★★
"Managed a 480-foot condo seawall project for our HOA. Their team handled board reporting, phased the work to keep all slips occupied, and delivered final inspection records in a clean project binder. Reference projects we visited matched what we got."
Rebecca N.Coral Gables · Commercial marine construction
★★★★★
"Routine inspection ahead of hurricane season. Diver went underwater, found two voids forming behind the wall that we did not know about. They quoted polyurethane injection at a fair price and the work was done in a day."
Eric N.Coconut Grove · Pre-season inspection

Dock FAQ.

How long does new dock construction in Miami take?

Permitting typically takes 60 to 180 days depending on jurisdiction and complexity. Construction itself, once permits are in hand, runs 3 to 6 weeks for a typical residential dock.

What dock material lasts longest in Miami saltwater?

Concrete pilings have the longest service life (50 to 75 years) followed by composite (40 to 60). Pressure-treated wood pilings are 25 to 35 years in Miami salt water. For decking, composite leads on maintenance with about 25 years of service life.

Build or repair your Miami dock.

Engineered hardware, code-compliant, permits handled.

Schedule Free Inspection

or call (555) 000-0000